First Bay At Coolum Reopens After Major Landslip Repairs Along David Low Way
First Bay at Coolum Beach has reopened after major landslip repair works, restoring public access and strengthening the cliff face above David Low Way.

Sunshine Coast Council says major landslip repairs at First Bay, Coolum, are complete and the area has reopened.
First Bay at Coolum Beach has reopened after major landslip repair works, restoring public access to a scenic stretch of coastline and strengthening the cliff face above David Low Way. The project is a local tourism and community story because First Bay is used by walkers, runners, beachgoers, cyclists, drivers and visitors moving along one of the Coast's most recognisable coastal routes.
Sunshine Coast Council secured the cliff face after severe weather damaged the area in early 2022. The council's official project page says the repair works are now complete and the area is reopened for the community to enjoy. Council also acknowledged that the project took longer than expected and thanked residents for patience while the works were delivered.
The engineering work was significant. The completed works include 145 metres of newly rebuilt pedestrian pathway on the eastern side of David Low Way and major stabilisation of the cliff above First Bay. Crews installed 92 deep foundation piles, some reaching up to 18 metres below ground, along with steel-reinforced capping beams. The project used more than 1100 cubic metres of concrete and more than 110 tonnes of reinforcing steel to strengthen the slope.
Those numbers matter because this was not only a cosmetic repair to a beach path. The aim was to reduce future landslip risk and protect infrastructure beside a road that carries locals, visitors and emergency access. Councillor Maria Suarez said the works significantly reduced future risk and helped safeguard an important coastal route. Federal and state disaster recovery funding partners also framed the project as a resilience measure, not just an access fix.
For Coolum and nearby businesses, reopening matters in practical ways. Long construction periods can change how people move through a beach precinct. They can discourage casual stops, affect walking loops, shift parking behaviour and make visitors feel that a favourite place is partly closed. Restored access gives locals and tourists a clearer reason to return to First Bay and the David Low Way coastal corridor, especially during winter school holidays when families look for accessible outdoor options between showers and surf conditions.
The project also carries a wider lesson for coastal councils. The Sunshine Coast's beach infrastructure sits inside a changing risk environment: severe rain, erosion, landslips, coastal exposure and higher public use all put pressure on roads, paths and foreshore assets. Repairing damage after an event is only part of the job. The harder task is rebuilding in a way that can better withstand the next event without cutting people off from places that define the region.
The reopening should also make the area easier to manage through peak visitor periods. Clear public access reduces the temptation for people to use informal tracks or unsafe edges, while a rebuilt pathway gives walkers and runners a predictable route beside the coast. The success of the repair will be judged by whether it feels ordinary again.
More in Tourism
Keep reading

Jai Roots-Linked Maroochydore Hostel Approval Puts 90 Traveller Beds On Ocean Street
Sunshine Coast Council has approved a 90-bed backpacker hostel at 6 Ocean Street, adding short-term traveller accommodation inside an existing Maroochydore commercial building.

Robert Irwin Puts Sunshine Coast Home And Australia Zoo On Global Travel Stage
Robert Irwin has put the Sunshine Coast and Australia Zoo in front of an international travel audience, describing the region as the home base that still shapes his work and tourism message.

Mooloolaba Foreshore Amenities Work Starts After Loo With A View Demolition
Construction has started on the new public amenities block at Mooloolaba, marking a visible step in the foreshore revitalisation work that replaced the old Loo with a View.